Skip to main content
TransformWR
Home
Transformative change
Active Transportation
Zero Emission Vehicles
Fuel Switching Our Buildings
Use Less and Waste Less
Thriving Local Food System
Equity, Prosperity & Resilience
Actions
Indicators
About
Search
ClimateActionWR
Loading...
Loading...
Loading...
Loading
Organizations
Region of Waterloo
TransformWR
Waterloo Region's TransformWR
Responsible in 54 actions
ID
Action title
Implementation phase
Tasks
Responsible parties
Indicators
Information updated
1.1.1
Plan a network of major active transportation corridors across cities and townships, that will provide high-volume priority travel for walking, cycling, and rolling to key destinations across the region, as well as access to public transit
Implementation
6 tasks
neljä kuukautta sitten
1.1.2
Plan for and build neighbourhood connections to the active transportation network
Implementation
No tasks
neljä kuukautta sitten
1.1.3
Implement further policies across the region to prioritize active transportation in road and trail design and reconstruction
Implementation
No tasks
neljä kuukautta sitten
1.1.4
Identify and implement policy and program opportunities to de-incentivize driving
Implementation
No tasks
neljä kuukautta sitten
1.1.5
Design and maintain active transportation infrastructure to ensure year-round access, safety, and comfort for people of all ages and abilities
Planning
No tasks
neljä kuukautta sitten
1.2.1
Complete Phase 2 ION to Cambridge, and plan for future higher-order transit service on additional key corridors
Planning
No tasks
neljä kuukautta sitten
1.2.2
Ensure priority access for walking, cycling, and rolling to transit stations and bus stops
Implementation
No tasks
neljä kuukautta sitten
1.2.3
Continue to expand access to transit across cities and townships
Planning
No tasks
neljä kuukautta sitten
1.2.4
Connect people to intercity, multimodal, and emerging transportation solutions
Implementation
No tasks
neljä kuukautta sitten
1.2.5
Improve transit infrastructure and technologies to increase rider comfort and convenience
Planning
No tasks
neljä kuukautta sitten
1.3.1
Launch micro mobility systems (bike, e-bike and e-scooter-sharing systems) in Waterloo Region communities
Continuous
1 tasks
neljä kuukautta sitten
1.3.2
Expand and innovate on existing programming (e.g. Travelwise) that supports employers and employees in making active transportation and transit the easy and preferred choice for commuting and business travel
Implementation
No tasks
neljä kuukautta sitten
1.3.3
Create community active transportation hubs to provide customized support, education, training, and resources
Not started
No tasks
kaksi vuotta sitten
1.3.4
Develop active transportation and transit programs that target equity-deserving communities
Implementation
No tasks
neljä kuukautta sitten
1.3.5
Post-pandemic continued adoption of work from home and flexible work schedules for reducing trips or shifting trips to off-peak times
Implementation
No tasks
kolme kuukautta sitten
1.4.1
Increase the efficiency of commercial goods movement
Not started
No tasks
neljä kuukautta sitten
1.5.1
Create “15 minute neighbourhoods” where people can meet their daily needs by walking, cycling, or rolling
Planning
No tasks
kolme kuukautta sitten
1.5.2
Implement design standards for new developments to build for walking, cycling, and rolling to be the primary mode of travel
Planning
No tasks
kuusi kuukautta sitten
1.5.3
Site key community services, health facilities, subsidized housing, etc., in central areas where they can be easily accessed using the active transportation and public transit systems
Not started
No tasks
neljä kuukautta sitten
2.1.2
Plan and begin to implement a transition to zero emission vehicles for municipal fleets, working towards a goal of at least half of municipal vehicles being zero emissions by 2030
Implementation
1 tasks
neljä kuukautta sitten
2.1.3
Plan and begin to implement the transition of commercial vehicle fleets to zero emissions vehicles
Not started
No tasks
neljä kuukautta sitten
2.1.4
Grand River Transit to pilot zero emission vehicles, and implement a full zero emission vehicle strategy (full transition expected to be complete by 2040)
Implementation
No tasks
neljä kuukautta sitten
2.2.1
Provide more public electric vehicle charging stations in public spaces, commercial spaces and other places visited by the public
Planning
No tasks
kuusi kuukautta sitten
2.2.2
Require all new residential parking spaces, and a portion of new non-residential parking spaces, to be constructed as "EV-ready"
Planning
No tasks
kolme kuukautta sitten
3.1.1A
Upgrade commercial building walls, foundations, attics, windows and doors to reduce heat losses
Planning
No tasks
kaksi kuukautta sitten
3.1.2
Implement a public literacy campaign to explain and promote the adoption of electric heat pumps for space and water heating in residential and commercial buildings
Implementation
No tasks
kuusi kuukautta sitten
3.1.3B
Switch home heating and water heating off of fossil fuels
Implementation
No tasks
kaksi kuukautta sitten
3.1.5
Identify and implement necessary supports to transition anyone still using fuel oil, or propane for heating to other fuel sources by 2025
Planning
No tasks
kaksi vuotta sitten
3.1.6
Install renewable energy generation in business and residential buildings
Planning
No tasks
kaksi vuotta sitten
3.1.9
Offer innovative loans for energy-related residential and commercial building upgrades
Planning
3 tasks
seitsemän kuukautta sitten
3.1.10A
Create a one-window service to support energy-related upgrades for homes
Planning
No tasks
kaksi kuukautta sitten
3.2.3
Develop region-wide building standards to encourage and support zero-carbon development of all new buildings in the region
Planning
No tasks
kolme kuukautta sitten
3.2.4
Incorporate energy planning considerations into the development application review process
Planning
No tasks
kolme kuukautta sitten
3.2.7
Show leadership by building net-zero carbon in the public sector
Planning
No tasks
kolme kuukautta sitten
4.1.1
Continue to maximize opportunities to expand residential curbside diversion programs, landfill gas capture, and waste to energy, and reduce waste overall
Implementation
1 tasks
neljä kuukautta sitten
4.1.2
Provide organics collection in all multi-residential buildings
Planning
No tasks
neljä kuukautta sitten
4.1.3
Support the use of compost/organics collection programs for all commercial buildings
Implementation
No tasks
neljä kuukautta sitten
4.2.1
Implement community waste reduction and circular economy campaigns
Not started
No tasks
kaksi kuukautta sitten
4.2.4
Reduce unnecessary building demolitions and construction waste
Not started
No tasks
neljä kuukautta sitten
5.1.1
Continue to develop and enforce robust land use planning protections for prime agricultural land
Planning
No tasks
seitsemän kuukautta sitten
5.2.1
Create a region-wide agricultural industry strategy to support the agriculture and agri-food sector
Not started
No tasks
neljä kuukautta sitten
5.4.2
Provide a variety of low GHG food options and plant-based dining options in local restaurants, grocery stores, and catered events
Not started
No tasks
kaksi kuukautta sitten
6.1.1
Establish metrics to measure progress on increasing equity through GHG reduction initiatives in our community
Not started
No tasks
neljä kuukautta sitten
6.1.2
Incorporate education on sustainability justice and equity into climate action planning
Planning
No tasks
kolme kuukautta sitten
6.1.3
Fund a climate justice committee led by community members from equity-seeking groups
Not started
No tasks
kaksi vuotta sitten
6.1.4
Provide specialized resources/support to organizations on prioritizing equity while planning their transition
Not started
No tasks
neljä kuukautta sitten
6.1.5
Collaborate with Mennonite communities in the rural townships to build customized energy transition support to meet their unique needs
Not started
No tasks
kuusi kuukautta sitten
6.1.6
Build reciprocal relationships between Indigenous groups and local municipalities and climate action organizations to ensure GHG reduction work is done in equitable ways that respect the land and traditions of Indigenous groups
Planning
No tasks
kolme kuukautta sitten
6.1.8
Apply an equity lens to all the actions in this transformation
Implementation
1 tasks
kolme kuukautta sitten
6.2.1
Develop and support a clean technology cluster in Waterloo Region
Implementation
1 tasks
kolme kuukautta sitten
6.3.4
Evaluate how to identify and protect optimal areas for industrial-scale renewable energy generation
Not started
No tasks
kaksi vuotta sitten
6.5.1
Bring community organizations and local government together to collectively identify and communicate advocacy priorities to multiple levels of government
Planning
No tasks
kaksi vuotta sitten
3.1.1B
Upgrade residential building walls, foundations, attics, windows and doors to reduce heat losses
Implementation
No tasks
kaksi kuukautta sitten
3.1.3A
Switch business heating and water heating off of fossil fuels
Not started
No tasks
kaksi kuukautta sitten